Even a small kitchen can be well planned & kitted out!

The Tithe Barn

A Tower client recently had an all electric kitchen fitted and the LPG gas disconnected. This may be the way forward, as the cooking rings are all induction, combined with Rational combis and electric fryers.
A very beautiful show-piece kitchen.

Leicester Racecourse Kitchen INstall

In conjunction with Crocodile Catering Tower recently installed a new kitchen at Leicester Racecourse. The kitchen included equipment from Lincat, ChefQuip, Polar and bespoke fabricated tables and canopy.

Leicester Racecourse Kitchen INstallNew kitchen installRacecourse Kitchen - Leicester

Church kitchen complete

The Rugby Christian Fellowship contracted Tower (through partner Euro Catering Ltd) to transform an empty room into a complete kitchen during November.

When our engineers arrived the room was a complete void, with just a few pipes sticking out of the wall. When they left (3 days later**) it was a working kitchen with:

  • Palux 4 ring Induction hob
  • Palux Vario Pad
  • Giorik 10 Grid Combi Oven
  • Hot Cupboard & Light Gantry
  • Dishwasher
  • Extraction System
  • Sinks & waste disposal

Tower performed all of the electrical, plumbing and waste connection work. All equipment in the kitchen is electrically powered.


**Taking just 3 days for a complete kitchen installation project such as this one is unusual. Tower don’t generally recommend that clients plan for such a short turnaround time unless they have very unusual circumstances and the budget to support such a project.

Recently Tower installed a new Palux Combi Oven in a small restaurant near Warwick Castle.

The install would have been quick and simple except for one ‘minor error’ in the pre-installation survey conducted by the Restaurant owner. The owner knew that the building had a 3 phase electrical supply and assumed that the kitchen was on that circuit. Unfortunately, the 3 phase stopped outside the kitchen.

So, before installing the Palux, it was necessary to run the 3 phase power into the kitchen. If there had been no 3-phase in the building then the project would have proved to be something of a nightmare.

This is one example of why a professional pre-installation site survey is always recommended prior to the purchase and installation of new commercial catering equipment.

During October Nottingham Girls School (NGS) will be having their old Zanussi flight dishwasher replaced with a new Meiko machine. As with other well run commercial catering operations the kitchen equipment at NGS is on a rolling replacement program.

Tower Engineers performing the contracted preventative maintenance work identify which equipment is coming towards the end of its useful, efficient and reliable life. The catering manager is informed of any equipment which is getting heavily used and wearing quickest in plenty of time (usually 12-18 months in advance of possible issues) to allow effective financial planning for replacement.

This approach allows the identification of problematic areas & equipment with a view to minimising any issues of unreliability or downtime in expensive and critical kitchen equipment. The aim for both the catering manager and Tower is to ensure that the catering operation is as cost effective as possible over the long term.